Skip to content

Coal boilers with VCFV

We successfully implement coal-fired thermal power equipment using VCFV (high-temperature circulating fluidized bed) technology, achieving excellent technical and economic results based on thorough study and research. Research into the operation and principles of the coal combustion process in VCFV was carried out using mathematical modelling of these processes and comparison of these models against existing VCFV boilers.

boiler output
1–50 MWboiler output
steam capacity
up to 180 t/hsteam capacity
operating gross efficiency
85–87 %operating gross efficiency
turndown range
20–100 %turndown range
Coal boilers with VCFV

We now offer a whole range of proven, reliable VCFV furnaces and boilers with an output from 1 to 50 MW and higher (capacities of up to 180 MW are available).

Many years of successful operation of VCFV boilers under real boiler-house conditions have refuted the widespread belief that fluidized bed technology is unsuitable for industrial power engineering because of its complexity and high implementation costs. VCFV technology requires no special expensive equipment and is fully adaptable to most domestic boilers at minimal cost. A bed of suitable height is formed without an inert material charge, thanks to the fuel's own ash, and operates on a moving ribbed grate, which externally resembles a narrow, inclined layer-fired furnace. When existing boilers are refurbished, the main technological equipment is generally retained. The combination of the advantages of VCFV and the principle of burning fuel on a moving grate (as in layer firing) has a number of benefits, both in terms of boiler operating reliability and in terms of quickly mastering the new technology.

Calorific value, kcal/kgQph7082÷1556
Ash content, %Ap10,3÷36,7
Moisture content, %Wp8,0÷55,2
Volatile matter content, %Vr11,6÷70,0
Fraction composition (grain size), mm–0-13÷0-50

Advantages of VCFV boilers (compared with standard layer-firing boilers):

  • Higher reliabilityincreased reliability thanks to the elimination of unreliable components and mechanisms
  • Easier operationoptimized operation process
  • Almost any coalwider range of usable fuels: virtually any type of coal can be burned (calorific value from 1500 to 6000 kcal/kg, ash content up to 50%, grain size from 6 to 50 mm)
  • Efficiency 85–87%increased operating gross efficiency to 85 - 87% compared with 72 - 80% for standard layer-firing boilers
  • Turndown 20–100%increased load turndown range (from 20 to 100% of output)
  • More than 3× less NOₓpossibility of using methods that reduce nitrogen oxide (NOх) emissions already inside the furnace to 1500 - 200 mg/m3 of gas (more than 3 times)
  • 5–6× less emissionspossibility of multi-stage capture of small fuel and ash particles and their return to the furnace for burnout, which reduces the concentration of solid emissions released into the atmosphere by a factor of 5-6 compared with standard layer firing.
Boiler typeHot-water boiler 17.5 MWSteam boiler 10 t/hHot-water boiler 35 MW
Combustion typeVCFVlayersVCFVlayersVCFVlayers
Fuelhard coal blendNeryungri hard coalMontenegrin coal screenings
Operating gross efficiency, %83-8670-7685-8773-7684-8772-77
Load turndown range, % of Dnom20-15050-8020-15040-10020-15050-80
Fly ash emissions, μg/m31,5-212-151,5-212-151,5-212-15
Nitrogen oxide NOx emissions, mg/m3150-200300-400200-240300-400145-200300-400
Petrokotel-VCFV

In the construction and refurbishment of boilers we cooperate with the company "Petrokotel-VCFV". The team of "Petrokotel-VCFV" is currently the main development group focused on boiler development in Russia. The equipment is manufactured in the Russian Federation and Ukraine. The main manufacturer of VCFV furnaces is the company CHENKO-BUD.

References

Projects

2014

Approx. 100 projects in 2014

Coal boilers with VCFV, Waste heat boilers and energy-process boilers
Client
worldwide
Country
Worldwide

Boilers, components and piping for power engineering and industry – summary of projects completed in the given year.

2013

Approx. 100 projects in 2013

Coal boilers with VCFV, Waste heat boilers and energy-process boilers
Client
worldwide
Country
Worldwide

Boilers, components and piping for power engineering and industry – summary of projects completed in the given year.

2012

Approx. 70 projects in 2012

Coal boilers with VCFV, Waste heat boilers and energy-process boilers
Client
worldwide
Country
Worldwide

Boilers, components and piping for power engineering and industry – summary of projects completed in the given year.